Help

Utility Regulations & WAC Code RuleCode Rules (EL 406)

Term: 2014-2015 SUMMER QUARTER

Faculty

There is not currently a faculty member for this course

Schedule

Mon-Tue-Wed-Thu, 6:50 AM - 4:05 PM (6/24/2014 - 9/25/2014) Location: *

Description

Requirements of our local serving utility, Pacific Power & Light. Topics covered will include but are not limited to, service lateral burial depths, overhead service height requirements, conduit sizing in relation to service ampacities, use of rigid metal conduit, use of PVC conduit, CT installation requirements, support requirements for overhead services and proper use of the required forms and documents that PP&L utilizes. Washington State requirement for the installation of electrical equipment and conductors.